As well as the usual updates and new products as shown below Merlin have now added over 12,000 popular products to this blog. All of the industrial products offer discounted prices and can be purchased online or via account.
A sample of some of the access equipment available on the new Merlinblog.com E-shop.
Sale!
HBC003 Easy Action Safety Steps 3 Treads Cupped Feet
£289.20 £212.81 Excl. VAT
Add to basket
Sale!
HBC004 Easy Action Safety Steps 4 Treads Cupped Feet
£319.20 £235.56 Excl. VAT
Add to basket
Sale!
HBC005 Easy Action Safety Steps 5 Treads Cupped Feet
£367.20 £271.96 Excl. VAT
Add to basket
Sale!
Industrial Mobile Safety Steps 10 Tread
£772.80 £598.00 Excl. VAT
Add to basket
Sale!
Industrial Mobile Safety Steps 11 Tread
£847.06 £655.46 Excl. VAT
Add to basket
Sale!
Industrial Mobile Safety Steps 12 Tread
£926.02 £717.00 Excl. VAT
Add to basket
Sale!
Industrial Mobile Safety Steps 13 Tread
£1,139.21 £882.00Excl. VAT
Add to basket
Sale!
Industrial Mobile Safety Steps 14 Tread
£1,262.02 £977.00Excl. VAT
Add to basket
Sale!
Industrial Mobile Safety Steps 2 Tread
£281.40 £218.00 Excl. VAT
Add to basket
Sale!
Industrial Mobile Safety Steps 3 Tread
£310.97 £241.00 Excl. VAT
Add to basket
Sale!
Industrial Mobile Safety Steps 4 Tread
£367.42 £285.00 Excl. VAT
Add to basket
Sale!
Industrial Mobile Safety Steps 5 Tread
£404.04 £313.00 Excl. VAT
Add to basket
Galvanised Pallet Trucks are steel pallet trucks that have been dipped and coated to prevent rust and to offer extended durability in damp and corrosive atmospheres normally toxic to steel pallet trucks.
Read more …
Speedy scaffold towers allow for each project to be individually catered for so that depending on the platform height required you can just use the minimum scaffolding required and easily add more sections as the work progresses. Available in 4 packs and can be installed quickly and transported easily.
Read more …
Our range of Trade & industrial grade scaffold towers include 3T compliant towers that comply fully with the Working at Height Regulations (2005). The 3T method of erecting a scaffold tower involves erecting the scaffold tower in sequence by accessing the next level via the trapdoor and fitting the braces above whilst in a ‘sitting position’. Once in place these braces offer sufficient protection to begin attaching the frames to the next level and so on.
Read more …